In order to isolate future plumbing work in the building, both during the construction and the future operations of the building, the Owner is proceeding with the replacement of all domestic main riser valves (as well as adding more valves to improve service).

All of these shut-off valves are located in the first floor corridor, evenly distributed from east to west. Unfortunately, in order to perform this replacement, Procida will have to shut off water to the entire building and completely drain the system each time it installs a valve (it’s a full day’s work for each valve).

The building, therefore, will be without water on the days that work will commence between the hours of 8:00 am – 4:00 pm. PCC will perform said work according to the following schedule:

  • Friday – August 8th
  • Thursday – August 14th
  • Friday – August 22nd
  • Friday – August 29th
  • Friday – September 5th